112學年度第2學期教師著作目錄管理系統 
您好!!  
>>教師著作目錄查詢

  1. 【查詢】按鈕:請先選擇學院→系所→教師,輸入起迄年或不輸入起迄年,再點選【查詢】即完成。
  2. 【進階查詢】按鈕:採用組合查詢的方式。
  3. 【匯出Word檔】按鈕:匯出教師【個人】著作資料。
搜尋條件:著作類別->全部著作 | 學院->College of Management | 系所->Department of Industrial Engineering and Management | 教師姓名->Low Chin-Yao
      
         西元年      
駱景堯老師的論文著述

一、學術期刊論文

  1. 駱景堯, 2017, 應用失效模式及效應分析於鋼管製造流程之研究, 南開學報, Vol.14, No.2, pp.49-58. (其他)
  2. Chinyao Low, 2017, Mathematical Modelling for a Multi-Product Inventory Routing Problem with Split Delivery, Journal of Applied Mathematics and Physics,, Vol.5, No.9, pp.1607-1612. (SCI, 其他)
  3. Chinyao low and Chien-min Chang, 2017, Integration of production scheduling and delivery in two echelon supply chain, International Journal of Systems Science: Operations & Logistics, Vol.4, No.2, pp.122-134. (SCI)
  4. Chinyao Low, Guan-He Wu and Rong-Kwei Li, 2016, Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval, Mathematical Problems in Engineering. (SCI)
  5. Low, chinyao and Wu, Guan-He, 2016, Unrelated parallel-machine scheduling with controllable processing times and eligibility constraints to minimize the makespan, Journal of Industrial and Production Engineering. (TSSCI)
  6. Yuling Yeh and Chinyao Low, 2016, Applying principal component and gray relational analysis to the optimum parameter design for printing, Journal of Nan-Kai. (其他)
  7. Chinyao Low and Wen-Yi Lin, 2015, Minimization of the Total Completion Time for a Single Scheduling with Learning Effect and Setup Times Consideration, WIT Transactions on Engineering Sciences. (EI)
  8. Low, chinyao, Wu, Guan-He, and Li, Rong-Kwei, 2015, Minimizing the sum of absolute deviations under a common due date for a single machine scheduling problem, Journal of Industrial and Production Engineering. (TSSCI)
  9. Chinyao Low and Sung-Nung Lin, 2014, Integrated Manufacturing System and Optimization of Process Parameters on Precision Plastic Injection Molding, Journal of Quality. (EI)
  10. Yeh, YuLing, Low, Chinyao, and Lin, Wen-Yi, 2014, Single machine scheduling with time-dependent learning effect and non-linear past-sequence-dependent setup times, Journal of Applied Mathematics and Physics. (其他)
  11. Chinyao Low, Guan-He Wu, and Rong-Kwei Li, 2014, Minimizing the sum of absolute deviations under a common due date for a single machine scheduling problem with availability constraints, Applied Mathematical Modelling. (SCI)
  12. Kuo, Wen-Ching, Kung, Shiang-Huei, and Low, Chinyao, 2013, Exploration on the Manufacturing Stragety for Recycleable Products in Green Supply Chain, International Journal of Applied Mathematics and Statistics. (EI)
  13. Low, Chinyao, Chang, Chien-min, and Li, Rong-Kwei, 2013, Coordination of production scheduling and delivery problems with heterogeneous fleet, International Journal of Production Economics. (SCI)
  14. Low, Chinyao and Lin, Wen-yi, 2013, Some scheduling problems with time-dependent learning effect and deteriorating jobs, Applied Mathematical Modelling. (SCI)
  15. Low, Chinyao and Lin, Sung-Nung, 2013, Fuzzy multiple criteria decision making model with fuzzy time weight scheme, Journal of Networks. (EI)
  16. Yeh, Yuling and Low, Chinyao, 2013, Application of Grey Theory for Forecasting of Dialysis Products, Journal of Nan-Kai. (其他)
  17. Yeh, Yuling, Low, Chinyao and Lin, Tsan-Hwan, 2012, Logistics Services Design using Combination of Quality Function Deployment and Modularity Concept, Journal of Nan Kai, Vol.9, No.1, pp.17-30. (其他)
  18. Low, Chinyao and Chen, Ya-hsueh, 2012, A model measurement system for collaborative supply chain partners, Journal of Manufacturing Systems. (SCI)
  19. Low, Chinyao and Lin, Wen-Yi, 2012, Some flowshop group scheduling problems with time-dependent learning effect and past-sequence-dependent setup times, Journal of Optimization Theory and Applications. (SCI)
  20. Yeh, Yuling, Hou, Tong-Hsu, and Low, Chinyao, 2012, The Classification of Children’s Occupational Therapy Problems using Neural Network, Lecture Notes in Electrical Engineering, Vol.1, pp.687-692. (EI)
  21. Low, Chinyao and Chen, Ya-hsueh, 2012, Criteria for the evaluation of a cloud-based hospital information system outsourcing provider, Journal of Medical Systems. (SCI)
  22. Chinyao Low, Rong-Kwei Li, and Chien-Min Chang, 2012, Integrated scheduling of production and delivery with time windows, International Journal of Production Research. (SCI)
  23. Low, Chinyao and Chen Yahsueh, 2011, Understanding the determinants of cloud computing adoption, Industrial Management and Data Systems, Vol.111, No.7, pp.1006-1023. (SCI)
  24. Kung, Shiang-Huei, Chikong Huang, and Chinyao Low, 2011, Order-Picking Algorithms for A Man-On-Board Automated Storage and Retrieval System, International Journal of Organizational Innovation, Vol.3, No.4, pp.180-195. (EI)
  25. Hsu, Chou-Jung, Low, Chinyao* and Su, Chwen-Tzen, 2010, A single-machine scheduling problem with maintenance activities to minimize makespan, Applied Mathematics and Computation, Vol.215, pp.3929-3935. (SCI)
  26. Chinyao Low and Wen-yi Lin, 2010, Minimizing the total completion time in a single-machine scheduling problem with a learning effect, Applied Mathematical Modelling. (SCI)
  27. Chinyao Low, Shiang-Huei Kung and Chikong Huang, 2010, Using data mining to solve flow shop problems, The international Journal of Organizational Innovations, Vol.2, No.4, pp.241-263. (EI)
  28. 駱景堯, 林文儀, 2010, 考慮瑋伯分配在非機遇原因下之ARMA管制圖經濟性設計, 品質學報. (EI)
  29. Low, Chinyao* and Lin, Wen-Yi, 2010, Single machine group scheduling with learning effects and past-sequence-dependent setup times, International Journal of Systems and Science. (SCI)
  30. Low, Chinyao*, Hsu, Chou-Jung and Su, Chwen-Tzeng, 2010, A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance, Expert System with Applications, Vol.37, pp.6429-6434. (SCI)
  31. Low, Chinyao*, Ji, Min, Hsu, Chou-Jung and Su, Chwen-Tzeng, 2010, Minimizing the Makespan in a Single Machine Scheduling Problems with Flexible and Periodic Maintenance, Applied Mathematical Modelling, Vol.34, pp.334-342. (SCI)
  32. Hsu, Chou-Jung, Low Chinyao* and Su, Chwen-Tzen, 2010, Single-machine Scheduling Problem with an Availability Constraint under Simple Linear Deterioration, Journal of Chinese Institute Industrial Engineers, Vol.27, No.1, pp.1-10. (TSSCI)
  33. 駱景堯, 盧柏翔, 李宜軒, 2009, 考慮混合分批送貨和取貨之車輛途程問題數學模式建構, 先進工程學刊, Vol.4, No.3, pp.239-243.
  34. Chang, Ying-Pin and Low, Chinyao, 2009, Integrated feasible direction method and genetic algorithm for optimal planning of harmonic filters with uncertainty conditions, Expert System and Applications, Vol.36, pp.3946-3955. (SCI)
  35. Low, Chinyao, Chang, Ying-Pin, 2009, An Application of Sequential Neural-Network Approximation for Sitting and Sizing Passive Harmonic Filters, Expert System with Applications, Vol.36, pp.2910-2920. (SCI)
  36. Low, Chinyao and Yeh, Yuling, 2009, Genetic algorithm based heuristics for an open shop scheduling problem with setup, processing, and removal times separated, Robotics and Computer-Integrated Manufacturing, Vol.25, pp.314-322. (SCI)
  37. Low, Chinyao, Hsu, Chou-Jung, and Su, Chwen-Tzeng, 2008, A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines, Computers and Operations Research, Vol.35, pp.845-853. (SCI)
  38. Low, Chinyao and Chang, Ying-Pin, 2008, Integrated ant Direction Hybrid Differential Evolution and Orthogonal Array with Fuzzy Logics of Optimal Design in the Large Scale passive harmonic Filters, Expert System with Applications, Vol.34, pp.894-904. (SCI)
  39. Chang, Ying-pin and Low, Chinyao, 2008, Optimization of a passive harmonic filter based on the neural-genetic algorithm with fuzzy logic for a steel manufacturing plant, Expert systems with applications, Vol.34, pp.2059-2070. (SCI)
  40. Low, Chinyao, Hsu, Chou-Jung, and Su, Chwen-Tzeng, 2008, Minimizing the makespan with an availability constraint on a single machine under simple linear deterioration, Computers and Mathematics Application, Vol.56, pp.257-265. (SCI)
  41. Chang, Y.P. and Low, Chinyao, 2007, Optimal Design of Discrete-Value Passive Harmonic Filters Using Sequential Neural-Network Approximation and Orthogonal Array, IEEE Transactions on Power Delivery, Vol.22, No.3, pp.1813-1821. (SCI)
  42. 張英彬, 駱景堯, 2006, 以田口方法探討電力諧波濾波器之最佳化設計, 技術學刊, Vol.21, No.4, pp.309-316.
  43. Low, Chinyao, Yip, Yukling, and Wu, Tai-Hsi, 2006, Modelling and Heuristics of FMS Scheduling with Multiple Objectives, Computers and Operations Research, Vol.33, pp.674-694. (SCI)
  44. 張英彬, 駱景堯, 2006, 田口方法應用在鋼鐵廠諧波濾波器設計之最佳化, 技術學刊, Vol.21, No.3, pp.217-226.
  45. Yip, Yukling, Cheng, Chun Yuan, and Low, Chinyao, 2006, Sequencing of an M machine flow shop with setup, processing and removal times separated, International Journal of Advanced Manufacturing Technology, Vol.30, No.3, pp.286-296. (SCI)
  46. Pi, Wei-ning, and Low, Chinyao, 2006, Supplier evaluation and selection via Taguchi loss functions and an AHP, International Journal of Advanced Manufacturing Technology, Vol.27, No.5-6, pp.625-630. (SCI)
  47. Low, Chinyao, 2005, Simulated Annealing Heuristic for Flow Shop Scheduling Problems with Unrelated Parallel Machines, Computers and Operations Research, Vol.32, pp.2013-2025. (SCI)
  48. 黃開義, 黃文聰, 駱景堯, 2005, 知識產業生產力管理模式之建構-教學系統實證研究, 工程與科學技術期刊, Vol.1, No.1, pp.61-74.
  49. 駱景堯, 余豐榮, 洪松男, 2005, 結合類神經田口法與基因演算法於多品質特性製程參數設計最佳化, 品質學報, Vol.12, No.1, pp.113-125. (TSSCI)
  50. Low, Chinyao, Wu, Tai-Hsi and Hsu, Chih-Ming, 2005, Mathematical Modelling of Multi-Objective Job Shop Scheduling with Dependent Setups and Re-Entrant Operations, International Journal of Advanced Manufacturing Technology, Vol.27, No.1-2, pp.181-189. (SCI)
  51. Low, Chinyao, 2004, A Robust Simulated Annealing Heuristic for the Flow Shop Scheduling Problem, International Journal of Advanced Manufacturing Technology, Vol.23, No.9-10, pp.762-767. (SCI)
  52. Low, Chinyao, and Hsu, Chih-Ming, 2004, Benefits of Lot Splitting in Job Shop Scheduling, International Journal of Advanced Manufacturing Technology, Vol.24, pp.773-780. (SCI)
  53. Yu, Fong-Jung and Low, Chinyao, 2004, An Algorithm for the Determination of Optimal Design Parameters of Control Charts, International Journal of Advanced Manufacturing Technology, Vol.26, No.1-2, pp.65-89. (SCI)
  54. Pi, Wei-ning, Low, Chinyao, 2004, Supplier Evaluation and Selection Using Taguchi Loss Function, International Journal of Advanced Manufacturing Technology, Vol.26, No.1-2, pp.155-160. (SCI)
  55. 駱景堯, 葉玉玲, 洪正鴻, 2004, 非等效平行機台考量之多階段流程型排程問題研究, 管理與系統, Vol.12, pp.93-116. (TSSCI)
  56. 駱景堯, 林保源, 2004, 整合多層級配銷管理系統成本改善模式建構, 品質學報, Vol.11, No.1, pp.41-60. (TSSCI)
  57. Yu, Fong-Jung, and Low, Chinyao, 2003, A Design for an SPRT Control Scheme Based on Linguistic Data, International Journal of Production Research, Vol.41, No.6, pp.1299-1309. (SCI)
  58. Low, Chinyao, Hsu, Chih-Ming, and Yu, Fong-Jung, 2003, Analysis of Variations in a Multi-variate Process using NNs, International Journal of Advanced Manufacturing Technology, Vol.22, pp.911-921. (SCI)
  59. Wu, Tai-Hsi, Chen, Jeng-Fung, Low, Chinyao, and Tang, Pang-Ting, 2003, Nesting of two-dimensional parts in multiple plates using hybrid algorithm, International Journal of Production Research, Vol.41, No.16, pp.3883-3900. (SCI)
  60. Wu, Tai-Hsi, Low, Chinyao, and Wu, Wen-Tien, 2003, A tabu search approach to the cell formation problem, International Journal of Advanced Manufacturing Technology, Vol.23, No.11-12, pp.916-924. (SCI)
  61. 葉進儀, 駱景堯, 吳軍劼, 2003, 使用物件導向模擬技術及基因演算法探討某教學醫院健檢之設施規劃最佳化研究, 技術學刊, Vol.18, No.1, pp.91-102. (EI)
  62. 駱景堯, 葉進儀, 駱芳梧, 2003, 整備與拆卸時間考量之開放型排程問題之求解模式建立, 工業工程學刊, Vol.20, No.6, pp.565-574. (EI)
  63. 駱景堯, 許瑞麟, 2003, 批量分割於零工型排程之影響分析, 工業工程學刊, Vol.21, No.2, pp.193-202. (EI)
  64. Wu, Tai-Hsi, and Low, Chinyao, 2002, Heuristic Solutions to Multi-depot Location-routing Problems, Computers and Operations Research, Vol.29, No.10, pp.1393-1415. (SCI)
  65. 駱景堯, 余豐榮, 蔡建華, 2002, Bootstrap於非對稱性公差之製程能力指標信賴區間估計研究, 工業工程學刊, Vol.19, No.2, pp.107-117. (EI)
  66. Low, Chinyao, and Wu, Tai-Hsi, 2001, Mathematical Modelling and Heuristic Approaches to Operating Scheduling Problems in an FMS Environment, International Journal of Production Research, Vol.39, No.4, pp.689-708. (SCI)
  67. Syau, Yu-Ru, Low, Chinyao, and Wu, Tai-Hsi, 2001, A note on Convex Fuzzy Processes, Applied Mathematics Letters, Vol.15, pp.193-196. (SCI)
  68. 駱景堯, 余豐榮, 楊宗儒, 2001, EPC與SPC整合架構下之管制圖評估及選用, 工業工程學刊, Vol.16, No.6, pp.63-72. (EI)
  69. 吳泰熙, 駱景堯, 林東養, 2000, 多尺寸方形排列問題啟發式解法之研究, 工業工程學刊, Vol.17, No.1, pp.75-85. (EI)
  70. 駱景堯, 王維仁, 2000, 考量整備時間下之彈性零工型製造系統排程問題研究, 工業工程學刊, Vol.17, No.2, pp.121-132. (EI)
  71. 池文海, 駱景堯, 王宏, 2000, 多站平行佈置流程式彈性裝配系統之動態可靠度探討, 工業工程學刊, Vol.17, No.4, pp.393-404. (EI)
  72. 駱景堯, 池文海, 楊其龍, 1999, 類神經網路於製程管制之應用:具相關性數據模型之偵測與分析, 工業工程學刊, Vol.16, No.3, pp.377-390. (EI)
  73. 駱景堯, 吳泰熙, 張俊仁, 1999, 結合模糊理論與遺傳基因演算法在多目標彈性製造系統排程問題之探討, 工業工程學刊, Vol.16, No.3, pp.391-404. (EI)
  74. 駱景堯, 1999, 禁忌搜尋法在彈性零工型製造系統排程之探討, 工業工程學刊, Vol.16, No.5, pp.605-615. (EI)
  75. 駱景堯, 1999, 零工式生產系統之批量流研究, 工業工程學刊, Vol.16, No.6, pp.671-680. (EI)
  76. 駱景堯, 張俊仁, 1998, 遺傳基因演算法在彈性製造系統排程問題之探討, 大葉學報, Vol.7, No.1, pp.79-90.
  77. 駱景堯, 楊其龍, 1998, 製程間具相關數據之趨勢模型偵測探討, 大葉學報, Vol.7, No.1, pp.103-115.
  78. 駱景堯, 池文海, 唐文彥, 1998, 類神經網路在多變量品質管制之研究, 品質學報, Vol.5, No.1, pp.1-25.
二、研討會論文
  1. 駱景堯, 2014, Minimization of the Total Completion Time for a Single Scheduling with Learning Effect and Setup Times Consideration, International Conference on Information Technology and Management Science 2014, 2014/05/01-02, Transactions of the Wessex Institute, Hong Kong.
  2. 駱景堯, 王宥翔, 2014, 製程相依之雙機流程式生產排程問題探討, 2014全球商業經營管理學術研討會, 2014/05/01, 正修科技大學, 正修科技大學,台南.
  3. Chinyao Low and Guan-He Wu, 2013, A Single Machine Scheduling under Availability Constraints from a Common Due Date for Minimizing Absolute Deviation of Completion Times, The 9th International Conference on Optimization: Techniques and Applications, 2013/12/12-16, National Taiwan University of Science and Technology (NTUST), Taipei, National Taiwan University of Science and Technology (NTUST).
  4. Chinyao Low, Rong-Kwei Li, and Guan-He Wu, 2013, Ant colony optimization algorithms for unrelated parallel machine scheduling with controllable processing times and eligibility constraints, The Institute of Industrial Engineers Asian Conference 2013, 2013/07/18-20, Chinese Institute of Industrial Engineers, Taipei, NTUST, pp.79-87.
  5. 駱景堯, 高秉裕, 2013, 探討整合生產排程與車輛途程規劃的總成本最小化問題, 2013全球商業經營管理學術研討會, 2013/05/02, 正修科技大學, 台南、正修科技大學.
  6. 駱景堯, 林冠宇, 2013, 產能縮減限制下非等效平行機台生產排程之研究, 2013全球商業經營管理學術研討會, 2013/05/02, 正修科技大學, 台南、正修科技大學.
  7. Low, Chinyao and Lin, Song-Nung, 2012, Fuzzy Data Mining with TOPSIS for Fuzzy Multiple Criteria Decision Making Problems, The 19th International Conference on Industrial Engineering and Engineering Management, 2012/11/27-29, IEEE Xplore & Chinese Industrial Engineering Institution, ChangSha, China.
  8. 駱景堯, 楊証傑, 2012, 考慮車容量之廢棄物處理的車輛途程問題, 2012商管與資訊研討會, 2012/05/25-26, 國立臺北商業技術學院與臺灣資訊系統研究學會, 國立臺北商業技術學院,台北市.
  9. 駱景堯, 李婉慈, 2012, 應用田口方法於玻璃薄膜參數最佳化之研究, 2012商管與資訊研討會, 2012/05/25-26, 國立臺北商業技術學院與臺灣資訊系統研究學會, 國立臺北商業技術學院,台北市.
  10. 駱景堯, 劉鎮瑋, 2012, 具資源限制及非等效平行機台考量之流程型生產排程問題, 第一屆中台灣產業論壇暨服務創新管理學術研討會, 2012/03/29, 國立台中科技大學, 國立台中科技大學,台中.
  11. 駱景堯, 黃宥錡, 2012, 訂單式生產單機環境下訂單選擇與排程規劃, 第一屆中台灣產業論壇暨服務創新管理學術研討會, 2012/03/29, 國立台中科技大學, 國立台中科技大學,台中.
  12. 駱景堯, 張家維, 2012, 考量可委外生產之排程問題規劃, 第一屆中台灣產業論壇暨服務創新管理學術研討會, 2012/03/29, 國?臺中科技大學, 國?臺中科技大學,台中.
  13. 林嘉屏, 駱景堯, 2010, 應用灰關聯分析於染整製程參數最佳化之研究, 第四屆管理知識與技術提升學術研討會, 2010/05/12, 華梵大學, 台北市.
  14. 張瑜芬, 駱景堯, 2010, 多品質特性製程參數最佳化之研究-以染整業製程為例, 第四屆管理知識與技術提升學術研討會, 2010/05/12, 華梵大學, 台北市.
  15. 駱景堯, 詹景程, 2010, 考量整備時間與迴流限制之多階非等效平行機台生產排程問題, 前瞻管理學術與產業趨勢研討會, 2010/05/01, 國立聯合大學, 苗栗.
  16. 駱景堯, 吳冠禾, 2010, 考量資源與機台限制之非等效平行機台排程研究, 前瞻管理學術與產業趨勢研討會, 2010/05/01, 國立聯合大學, 苗栗.
  17. 駱景堯, 陳君豪, 2010, 單機排程問題與運輸規劃之整合, 前瞻管理學術與產業趨勢研討會, 2010/05/01, 國立聯合大學, 台北.
  18. Chinyao Low and Yahsueh Chen, 2009, The Performance Evaluation of Supply Chain by System Dynamics Modeling, The 10th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS), 2009/12/14-16, Waseda University, KitaKyushu.
  19. 駱景堯, 李盈峰, 2009, 考量尖峰時間車輛途程問題, 數位科技與創新管理研討會, 2009/06/20, 華梵大學資管系, 台北.
  20. Chinyao Low, Yuling Yeh, and Wen-yi, Lin, 2009, A new learning effect model for a single-machine scheduling problem, Hawaii International Conference on Business, 2009/06/12-15, Hawaii University, Hawaii, USA.
  21. 駱景堯, 盧柏翔, 李盈峰, 2009, 利用禁忌演算法求解混合分批送貨和取貨之車輛途程問題, 新世代工業工程與系統管理研討會, 2009/05/22, 僑光技術學院工業工程與管理學系, 台中.
  22. 駱景堯, 林建宏, 2009, 每日需求變異下考慮人員分區之多趟次車輛途程問題, 新世代工業工程與系統管理研討會, 2009/05/22, 僑光技術學院工業工程與管理學系, 台中.
  23. 駱景堯, 施富棋, 陳科瀚, 2009, 迴流考量之流程型工廠排程問題之數學模式建構, 第三屆管理與決策學術研討會, 2009/05/15, 嘉義大學, 嘉義.
  24. 施學仕, 駱景堯, 李宜軒, 2009, 鋁合金輪圈外徑加工製程最佳化參數探討, 第三屆管理與決策學術研討會, 2009/05/15, 嘉義大學, 嘉義.
  25. 駱景堯, 許建民, 2009, 應用DEA方法於作業基礎成本制度下的成本管理與探討, 第七屆 產業管理創新研討會, 2009/05/15, 修平技術學院工業工與管理學系, 台中.
  26. 駱景堯, 施富棋, 陳璿安, 2009, 迴流考量之流程型工廠排程問題研究, 資訊管理暨商務科技研討會, 2009/05/08, 環球技術學院資訊管理學系, 雲林.
  27. 駱景堯, 溫舜光, 陳璿安, 2008, 考量分批送貨的區位途程問題之數學模式建構, 九十七年度工業工程年會暨學術研討會, 2008/12/13, 中壢,中原大學.
  28. 駱景堯, 盧柏翔, 李宜軒, 2008, 考慮混合分批送貨和取貨之車輛途程問題數學模式建構, 九十七年度工業工程年會暨學術研討會, 2008/12/13, 中壢,中原大學.
  29. Low, Chinyao, and Lin, Sung-Nung, 2008, Apply Taguchi Method and Simulation Technology to Optimal Job Shop Scheduling and Production Lot Size - An IC Assembly House Case, The 9th Asia Pacific Industrial Engineering and Management Systems Conference, 2008/12/03-05, Bali.
  30. 駱景堯, 溫舜光, 陳科瀚, 2008, 考量分批的送貨的區位途程問題, 服務業與創新管理學術研討會, 2008/11/15, 南台科技大學, 台南.
  31. 張鈺芳, 駱景堯, 鄭宏彬, 2008, 考量整備時間與迴流限制之多階平行機台生產排程問題探討, 服務業與創新管理學術研討會, 2008/11/15, 臺南、南台科技大學.
  32. Low, Chinyao, and Yeh, Yuling, 2008, The Impact of Lot Streaming in a Single Machine Scheduling Problem with Earliness-Tardiness Penalities, The 41st CIRP Conference on Manufacturing Systems, 2008/09/12-15, Tokyo.
  33. 駱景堯, 盧柏翔, 溫舜光, 2007, 單元形成問題之研究, 2007科技與管理學術研討會, 2007/12/13, 台南, CD 光碟.
  34. Chwen-Tzeng Su, Chin-Yao Low, Wen-Yi Lin, 2007, The study on the policy of the Bullwhip Effect under different demand, Proceeding of 8th APIEMS, 2007/12/09-12, 高雄, CD 光碟.
  35. 駱景堯, 施富棋, 張鈺芳, 2007, 無等候條件考量下非等效平行機台之流程型排程問題研究, 第十三屆資訊管理暨實務研討會, 2007/12/08, 高雄, CD 光碟.
  36. 駱景堯, 盧柏翔, 溫舜光, 2007, 兩階段等效平行機台於流程式生產系統批量流之研究, 2007年中華商管科技年會暨學會術研討會, 2007/10/24, 台南, CD 光碟.
  37. 駱景堯, 施富棋, 張鈺芳, 2007, 阻隔條件考量下具非等效平行機台之流程型排程問題研究, 2007年中華商管科技年會暨學會術研討會, 2007/10/24, 台南, CD 光碟.
  38. 駱景堯, 許洲榮, 蘇純繒, 2006, 九十五年度工業工程年會暨學術研討會, Minimizing the makespan in a single machine scheduling problems with flexible and periodic manitenance, 2006/12/08, 東海大學.
  39. 駱景堯, 2006, MINIMIZING THE MAKESPAN WITH AN AVAILABILITY CONSTRAINT ON A SINGLE MACHINE UNDER SIMPLE LINEAR DETERIORATION, 11th International Conference on Industrial Engineering Theory, Applications and Practice, 2006/10/24-27, 名古屋.
  40. Chinyao Low and YukLing Yip, 2006, Performance of heuristics for an open shop scheduling problem, Hawaii International Conference on Business, 2006/05/25-28, Hawaii University, Hawaii, USA.
 
讀取 pdf 檔請安裝 Adobe Reader (下載點) 本系統請使用瀏覽器IE 6.0以上版本
 

SSO單一入口網 SSO ∣ YunTech雲科大首頁 YunTech Home ∣ mail諮詢信箱 Mail ∣ Home首頁 Home ∣ Reg帳號註冊 Registerlogon登入 Login